招标控制价是招标人根据国家或省级、行业建设主管部门颁发的有关计价依据和办法,以及拟定的招标文件和招标工程量清单,结合工程具体情况编制的招标工程的最高投标限价。
《建设工程工程量清单计价规范》(GB50500-2013)强制性规定,“国有资金投资的建设工程招标,招标人必须编制招标控制价”。
《建筑工程施工发包与承包计价管理办法》规定“国有资金投资的建筑工程招标的,应当设有最高投标限价;非国有资金投资的建筑工程招标的,可以设有最高投标限价或者招标标底”。
最高投标限价及其成果文件,应当由招标人报工程所在地县级以上地方人民政府住房城乡建设主管部门备案。
The Tender Control Price refers to the maximum bid price limit for a tendered construction project, prepared by the Employer / Client based on the pricing standards and methods issued by national, provincial, or industry construction authorities, together with the proposed tender documents, Tender Bill of Quantities, and the specific circumstances of the project.
The Code of Valuation with Bill of Quantities of Construction Works (GB50500-2013) mandatorily stipulates that: “For construction projects funded by state-owned capital, the Employer / Client must prepare a Tender Control Price for the tender process.”
The Administrative Measures for Pricing Management of Building Construction Procurement and Contracting further provides that:
“For tendering of building construction projects funded by state-owned capital, a maximum bid price limit shall be established. For projects funded by non-state-owned capital, either a maximum bid price limit or a tender base price may be adopted.”
The maximum bid price limit and its supporting documents shall be filed by the Employer / Client with the housing and urban-rural development authority of the local people’s government at or above county level where the project is located.
我司具有丰富的建设工程项目招标控制价编制和审查经验,我们依据《建设工程工程量清单计价规范》(GB 50500-2013),使用规定的计价标准、采用工程造价管理机构发布的价格信息(或经市场调查确定的材料价格),结合施工现场情况、工程特点及常规施工方案,合理确定最高投标限价,为建设单位的建设项目投资成本控制提供专业技术支持与保障。
Our company possesses extensive experience in the preparation and review of Tender Control Prices for construction projects. In accordance with the Code of Valuation with Bill of Quantities of Construction Works (GB 50500-2013), we apply the prescribed pricing standards and utilise price information published by construction cost management authorities (or material prices determined through market research), together with actual site conditions, project characteristics, and conventional construction methodologies, to establish a reasonable and reliable maximum bid price limit.
Through this service, we provide professional technical support and assurance to project owners in effectively controlling project investment costs, enhancing procurement transparency, reducing commercial and pricing risks, and achieving sound construction cost management objectives.