工程量清单是指载明建设工程分部分项工程项目、措施项目、其他项目的名称和相应数量以及规费、税金项目等内容的明细清单。按其使用用途的不同,可分为招标工程量清单和已标价工程量清单。
招标工程量清单是招标人依据国家标准、招标文件、设计文件以及施工现场实际情况编制的,随招标文件发布供投标报价的工程量清单,包括其说明和表格。
已标价工程量清单是指构成合同文件组成部分的投标文件中已标明价格,经算术性错误修正(如有)且承包人已确认的工程量清单,包括其说明和表格。
《建设工程工程量清单计价规范》(GB50500-2013)强制性规定,“使用国有资金投资的建设工程发承包,必须采用工程量清单计价,工程量清单应采用综合单价计价”,“招标工程量清单必须作为招标文件的组成部分,其准确性和完整性应由招标人负责”。
《建筑工程施工发包与承包计价管理办法》规定“全部使用国有资金投资或者以国有资金投资为主的建筑工程,应当采用工程量清单计价;非国有资金投资的建筑工程,鼓励采用工程量清单计价”。
The Bill of Quantities (BQ) refers to a detailed schedule that sets out the names and corresponding quantities of work items for divisions and subdivisions of a construction project, provisional and measured works, other related items, statutory fees, taxes, and other cost components. Depending on its intended use, it may be classified as a Tender Bill of Quantities or a Priced Bill of Quantities.
The Tender Bill of Quantities is prepared by the Employer / Client in accordance with national standards, tender documents, design documents, and actual site conditions. It is issued together with the tender documents for the purpose of tender pricing and includes relevant descriptions and schedules.
The Priced Bill of Quantities refers to the Bill of Quantities contained in the tender submission forming part of the contract documents, in which rates and prices have been inserted, arithmetic errors (if any) have been corrected, and the corrections confirmed by the Contractor. It includes the relevant descriptions and schedules.
The Code of Valuation with Bill Quantity of Construction Works (GB50500-2013) mandatorily stipulates that:
“For construction projects funded by state-owned capital, procurement and contracting shall adopt the Bill of Quantities pricing method, and the Bill of Quantities shall be priced using composite unit rates.” It further provides that: “The Tender Bill of Quantities must form an integral part of the tender documents, and the Employer / Client shall be responsible for its accuracy and completeness.”
The Administrative Measures for Pricing Management of Building Construction Procurement and Contracting further stipulates that: “For building construction projects wholly funded by state-owned capital, or predominantly funded by state-owned capital, the Bill of Quantities pricing method shall be adopted. For projects funded by non-state-owned capital, the use of the Bill of Quantities pricing method is encouraged.”
我司具有丰富的建设工程项目工程量清单编制和审查经验,我们能够依据现行国家标准、《建设工程工程量清单计价规范》、工程量计算规范和其他工程造价计价要求,为客户提供准确、完整的招标工程量清单、已标价工程量清单,对客户做好成本控制提供专业支持和保障。
Our company possesses extensive experience in the preparation and review of Bills of Quantities for construction projects. In accordance with current national standards, the Code of Valuation with Bill of Quantities of Construction Works, quantity measurement rules, and other applicable cost management and pricing requirements, we are able to provide clients with accurate and comprehensive Tender Bills of Quantities and Priced Bills of Quantities.
Through these professional services, we support clients in achieving effective cost control, enhancing pricing accuracy, reducing commercial risks, and strengthening overall project cost management throughout the procurement and construction process.